Key statistics
| Countries | Producing Fields | 2012 Working interest production boepd | % oil/gas |
|---|---|---|---|
| 11 | 67 | 79,200 | 73/27 |
Tullow currently has production in 11 countries around the world from 67 producing fields. The majority of the 79,200 boepd average working interest production in 2012 came from Africa, followed by the Southern North Sea and then South Asia. The gas assets in these latter two regions are currently held for sale.
| Working interest production boepd | ||||||
|---|---|---|---|---|---|---|
| Core Area | Country | Asset | Interest | 2012 Actual |
2013 Forecast |
Fiscal Regime |
| West & North Africa | ||||||
| Congo (Brazz) | M'Boundi | 11% | 2,500 | 2,400 | PSC | |
| Côte d'Ivoire | Espoir | 21.30% | 3,400 | 4,000 | PSC | |
| EQ Guinea | Ceiba | 14.25% | 2,850 | 3,500 | PSC | |
| Okume | 14.25% | 8,350 | 6,200 | PSC | ||
| Gabon | Tchatamba | 25% | 4,000 | 4,000 | PSC | |
| Niungo | 40% | 2,500 | 2,100 | Tax | ||
| Etame Complex1 | 7.50% | 1,450 | 1,100 | PSC | ||
| Others | - | 6,050 | 6,800 | Various | ||
| Ghana | Jubilee | 35.48% | 25,450 | 37,750 | PSC | |
| Mauritania | Chinguetti | 22.25%2 | 1,300 | 1,200 | PSC | |
| Sub Total | 57,850 | 69,050 | ||||
| Europe, South America & Asia | ||||||
| Netherlands | Various | 4.1-22.5% | 6,350 | 5,200 | ||
| Norway | Brage | 2.5% | - | 250 | ||
| UK | CMS Area2 | 14.1-100% | 9,300 | 10,400 | Tax | |
| Thames Area | 50-87% | 750 | 50 | Tax | ||
| Sub Total | 16,400 | 15,900 | ||||
| Bangladesh | Bangora | 30% | 4,915 | 4,050 | PSC | |
| Pakistan | Shekhan-1 | 40% | 35 | 0 | - | |
| Sub Total | 4,950 | 4,050 | ||||
| TOTAL | 79,200 | 89,000 | ||||
1. Etame / Avouma / Ebouri
2. CMS Area production includes UK condensate production
*Data from latest fact books.
Tullow focused its 2010 development on fast tracking and monetising Phase 1 of the Jubilee field in Ghana. This trend continued throughout 2011 as the fields production ramped up and in 2012 additional capital was successfully invested to remediate some Phase 1 wells and to commence the Phase 1A development. In 2013, further capital is expected to be invested in the continued Phase 1A roll out and the commencement of the TEN development in Ghana.
| Country | Developments |
Sanction Decision |
First Production |
No. of Wells |
Status |
|---|---|---|---|---|---|
| West & North Africa | |||||
|
Congo (Brazzaville) |
M'Boundi Field Re-development |
|
Producing | 14+ wells p.a | Continued infill drilling with 2 rigs, including appraisal of recent SE MBoundi field extension. Gas reinjection project to be commissioned in H2 2013. |
| Côte d'Ivoire | Acajou appraisal | 2014 | 2016 | 1-2 | Satellite discovery near Espoir field. |
| Espoir Infill Drilling |
|
Q2 2013 | 8 + 4 | First 8-well project sanctioned and drilling operations commence Q1. Second 4-well project proceeding towards approval. | |
|
Equatorial Guinea |
Ceiba infill drilling |
|
Q2 2012 | 7 + 3 WO |
First 6 producers based upon 4D seismic added 18 mb/d gross production during 2012. Up to 4 more wells due on line, concluding the campaign by end 2013. |
| Deep water Okume Complex Infill drilling |
|
Q4 2013 | 8-12 | New-build tender assisted rig to drill 12 wells from Foxtrot TLP and then Echo TLP, plus 1 subsea producer tie-back. Rig due to arrive Q3 2013. | |
| Shallow water Okume Complex Infill drilling | 2013 | Q4 2014 | 4-8 | Jackup rig infill wells on Elon field in 2014, quantity to be determined from ongoing 4D seismic analysis. | |
| Gabon | Ebouri/Avouma (Etame complex) |
|
Q1 2013 | 3 workovers + 2 pilots & horizontals if successful + 1 Exploration | Commenced drilling Avouma producer, followed by 3 workovers, plus Ebouri appraisal well. Sanctioned development on SEENT field with new wellhead platform for 2014, plus new Etame wellhead platform for 2014. Template drilling to take place 2014. |
| Echira Infill | Q4 2013 | H1 2014 | 1 | Infill drilling scheduled for Q1 2014. | |
| Limande Re-development |
|
Q3 2013 | 5 | Four producers plus 1 gas injector commencing mid 2013, using same rig as Tchatamba. | |
| Niungo Infill |
|
Q4 2012 | 1 + 7 USRs | First 2 ultra short radius (USR) side-tracks added 1.5 mb/d. Niungo Deep Appraisal well in progress, followed by up to 5 more USR’s during 2013. | |
| Onal- Maroc Nord Development |
|
Producing | 18 wells per year | Development drilling at Maroc North and Onal in progress. 3D seismic under review to optimise infill targets. | |
| Tchtamba – Marin and South Infill |
|
Q2 2013 | 4 | Two producers at Marin platform Q2 2013, followed by 2 at South platform Q4 2013. | |
| Tsiengui |
|
Producing | > 20 prod | Phase 2 drilling commenced Q2 2011 (3 year program). Gas injection scheme being implemented. | |
| Turnix |
|
Q2 2013 | 2 | First well scheduled Q2 2013, using same rig as Limande and Tchatamba. | |
| Ghana | Jubilee Phase 1a |
|
Q4 2012 | 8 | Infill wells using existing and additional subsea infrastructure. Designed to raise recovery and extend plateau with 5 extra producers and 3 water injectors. First production achieved Q4 2012. Project completion by end 2013 with all wells on-line. |
| Jubilee Full Field | 2013 onwards | 2014-20 | 10-20 | Incremental development consisting of additional infill wells and subsea infrastructure to further raise recovery and maintain plateau production levels. A Full Field Development Plan (FFDP) is being discussed with the Government. Additional subsea tree equipment (long lead items) has been ordered. | |
| West Cape Three Points (Teak, Mahogany-East, Akasa) | 2014 | 2016-21 | 4-6 | Development possibilities are under discussion with Partners and Government, and development plan submission may follow. Tie-back in to Jubilee facilities is likely plan. | |
| Tweneboa/Enyenra/Ntomme (T.E.N) | 2013 | 2016 | 23 | Plan of Development (PoD) submitted to Government of Ghana in November 2012. Plan approval process underway. First oil timing 32-36 months post plan approval. | |
| Mauritania | Banda Gas | 2014 | 2016 | 2 | Development plan for gas scheme approved by Mauritanian Government in Q4 2012. Front end engineering work complete. Sanction will take place when gas sales agreement is in place. Active engagement underway. |
| East & South Africa | |||||
| Namibia | Kudu | End 2013 | 2016-2017 | 3-4 | Significant agreement progress made in 2012 with Namibian Government and Partners. Detailed FEED work commenced. Project sanction will require closure of gas sales agreement to new power station. |
| Uganda | Basin Wide Development | 2014 | 2017-2018 | 700+ | A basin wide development plan is being prepared by the partnership incorporating upstream development across the 3 Blocks, including refining and export infrastructure. |
| Europe, South America and Asia | |||||
| Netherlands | Joint Development Area (JDA) wells | 2013-2015 | Q1 2013 – 2015 | 6-7 | NAM operated wells using Swift rig and back-to-back drilling. |
| L-15-A Infill | 2013-2015 | Q3 2013 | 3 | 1 well per year over next 3 years. | |
|
UK CMS Area |
Schooner Infill |
|
Q3 2013 | 1 | SA-11 Infill well, Schooner field. |
| CMS, Boulton Field Infill | 2013 | 2014 | 1 | In planning. | |
| Bangladesh | Bangora Workovers |
|
2013 | 2 | Workovers of existing wells to replace tubing and add perforations to restore plateau rate to 100-120 mmscfd. |
| Bangora Phase 3 |
|
2014 | n/a | Installation of compression to maintain plateau production at 100-120 mmscfd and increase recovery. | |
| Bangora South | 2013 | 2015 | 1+ | Southern satellite to Bangora Field awaiting drilling sanction. | |
| Pakistan | Kohat Block | 2013 | 2014 | TBC | Possible appraisal or development decision following Shekhan Extended Well Test, and acquisition and interpretation of seismic data. |
| Kalchas Block |
|
2014 | 1+ | First well (Marri-1) planned for 2013 to be followed by appraisal programme in the event of success. | |
| Norway1 | Brage infill |
|
Producing | 4 – 5 infill | Ongoing production infill well drilling campaign through 2013/14, following rig upgrades due in Q1 2013. Operator change from Statoil to Wintershall awaiting approval from authorities, but expected early 2013. |
| Bream | End 2013 | 2017 | 7 | Licence extension pending. Development plan due to be submitted in Dec 2013. Leased FPSO development scheme currently envisaged. Upto five producers and two water injectors currently planned. | |
| Butch | 2015 | 2018 | 10+ | Two firm appraisal wells to be drilled in Q3/Q4 2013. PDO deadline Q1 2016. Development concepts currently range from subsea tieback to standalone facility. | |
1 Portfolio management of non core developments will be reviewed